A solid solution
Project time frame
2018
Contractor
Ommen & Møller A/S
Consultant
Cowi
Silkeborghus
With the Asger Jorn Museum as its nearest neighbour, the now 60-year-old high-rise building Silkeborghus lies in the most attractive part of Silkeborg. In the summer of 2018, the elevator tower got a well-deserved total overhaul of all the external surfaces. The tower is cast in concrete and has now stood for 60 years with different paint applications. After a thorough sandblasting, the contractor and advisor chose Marlon Finishing Putty B15 to level and fill the many hollows. The whole tower was then painted.
Marlon products applied
